Dam Construction at Vischer Ferry

11 Sunday Jan 2015

Posted by Eric Hamilton in Uncategorized

≈ 2 Comments

Construction of the dam across the Mohawk River at Vischer Ferry started during the construction season of 1907.  By the end of the following construction season a coffer dam had been constructed between the south side of the river to Goat Island and construction of this segment of the dam was well under way.
Construction in the south segment of the dam in 1908..
Note that the horizontal top of the berm and towpath of the Enlarged 1842 Erie Canal can be seen below the tree line on the north side of the river in the right background.    This photograph must have been taken from the top of the upstream head wall of lock 7 as shown in the back ground of the following photograph. North wall of Lock 7 under construction in Oct 1908. Photograph from the Mycon Collection
Construction of the north wall of Lock 7 is taking shape in this October 1908 photograph. In the foreground we can see form work for the down stream gate pocket under construction. The forms for the upstream gate pocket have not been removed. In the background to the left we see a couple of buildings of a large complex of shops and construction support buildings. In the right background one can see three barges on the 1842 Enlarged Erie Canal just above the coffer dam.
Construction of the early Power house.
Construction of Lock 7 is and the dam is functionally complete in this October 1911 photograph. Progress on the construction of the early power house slices through the 1842 Enlarged Erie Canal. The towpath of the canal is seen in the foreground. This construction promptly brought an end to any remaining Erie Canal traffic that used draft animals as propulsion. All traffic in 1911 was using steam power.
An interesting footnote to this construction is added a century later. During the flooding that occurred after Hurricanes Irene and Lee the earth dam between Lock 7 and the bank of the Mohawk on the opposite side of the river had to be reinforced on an emergency basis when seepage was noted undermining that small portion of the dam. Thousands of yards of fill was brought in and placed on the toe of this earthen portion of the dam. Had this part of the dam failed the downstream flooding in Vischer Ferry all the way to Crescent would have been much worse. With this emergency fill Lock 7 was again functional by December of the same year.

Officers:

Paul Olund, President
John Loz, Vice President
Maryanne Mackey, Treasurer
Eric Hamilton, Secretary

Board Members

Mary MacDonald
Jeffrey Slater
Lawrence D. Syzdek

Enter your email address to subscribe to this blog and receive notifications of new posts by email.

Join 536 other subscribers

Previous Posts

  • February 2023
  • December 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022
  • April 2022
  • March 2022
  • January 2022
  • November 2021
  • September 2021
  • August 2021
  • June 2021
  • May 2021
  • April 2021
  • January 2021
  • December 2020
  • November 2020
  • October 2020
  • September 2020
  • August 2020
  • June 2020
  • March 2020
  • December 2019
  • November 2019
  • October 2019
  • September 2019
  • August 2019
  • July 2019
  • June 2019
  • April 2019
  • March 2019
  • January 2019
  • December 2018
  • October 2018
  • September 2018
  • August 2018
  • July 2018
  • June 2018
  • May 2018
  • March 2018
  • February 2018
  • January 2018
  • December 2017
  • November 2017
  • October 2017
  • September 2017
  • August 2017
  • July 2017
  • June 2017
  • May 2017
  • March 2017
  • February 2017
  • January 2017
  • December 2016
  • November 2016
  • October 2016
  • August 2016
  • July 2016
  • June 2016
  • May 2016
  • April 2016
  • March 2016
  • February 2016
  • December 2015
  • October 2015
  • July 2015
  • May 2015
  • April 2015
  • March 2015
  • January 2015
  • December 2014
  • November 2014
  • August 2014
  • May 2014
  • November 2013
  • September 2013
  • August 2013
  • March 2012

Blog at WordPress.com.

  • Follow Following
    • Friends of the Mohawk Towpath Byway
    • Already have a WordPress.com account? Log in now.
    • Friends of the Mohawk Towpath Byway
    • Customize
    • Follow Following
    • Sign up
    • Log in
    • Report this content
    • View site in Reader
    • Manage subscriptions
    • Collapse this bar
 

Loading Comments...