Some exciting projects are in the works to improve the recreation facilities in the middle of the Mohawk Towpath Byway’s corridor. The Town of Clifton Park and their contractor will be holding a reconstruction meeting early in June. The most notable improvement will be a new pedestrian bridge over the 1842 enlarged canal east of Clute’s Dry Dock, with associated trail and parking improvements. Construction will be happening this summer into early fall, with timing riding on delivery of a pre-fabricated pedestrian bridge.  Arrangements are being made with the Town’s contractor, Bette & Cring. A pre-construction meeting is planned for next week, at which time we’ll expect to have a more detailed schedule.   Barton & Loguidice will be conducting construction inspection on the Town’s behalf.  

The entrance to the preserve at Clutes Dry Dock will change dramatically over the summer and may be closed during critical stages of construction.

A second project to construct a footbridge to the right in the background will connect to the 1825 towpath trail. Eagle Scout candidate Leo Coons is organizing this effort. This project will start this week as timber beams crafted by Amish are delivered! 

Docks for hand-launched car top craft: canoes/kayaks within the Clute’s Dry Dock basin will be removed for repair and maintenance offsite. The docks will be returned and set back into place once the main bridge construction project is substantially complete.