Or is it a new beginning?

Friends of the Mohawk Towpath Byway installed the final of a dozen interpretive kiosks envisioned in the Byway’s Corridor Management Plan almost twenty years ago. It started out as a cool, cloudy Saturday. Two hours later the job was done and the posts set plumb and true, ready for the first eye curious about our agricultural heritage or about recreation on the Mohawk.

Innovation was the watch word for this kiosk. Federal Byway funds were dwindling and we needed a less expensive way to produce the panels. Metal panels were used with a graffiti resistant finish. These panels were glued to an exterior plywood with a urethane based caulk. The panels were then mounted in a frame of cedar.

Once in place in two excavated post holes the holes were backfilled with an expanding foam backfill. Bill Gutelius steadied the kiosk for a critical 15 minutes while the backfill set. Nancy Papish maintained an eye on the vertical plumb bubble.
This kiosk is located in Mohawk Landing Preserve on the southern boundary of Riverview Orchards on Riverview Road in Rexford. Check it out on your next visit to the Byway. The spot is quite accessible just a short walk from the parking lot, at the end of the first board walk. You can see the kiosk from the entrance (note the handicap parking space in the foreground and the kiosk just to Nancy Papish’s right in the background.

Besides Nancy Papish’s help We are most grateful for Bill Gutelius’ assistance with construction of the frame, and hauling the finished kiosk assembly to the site. In short this kiosk installation cost about half the cost of conventional polycarbonate resin panels with square aluminum frame.










What’s a scenic byway? …a road less traveled? “…a road or track not following a main route; a minor road or path.” Spring time is as good a time as any to reflect on what makes a byway.
Thanks to the Schenectady County Historical Society for the opportunity to participate in the Canal Fest at the Mabee Farm! With over 500 cyclists coming through during the morning and the hundreds of people to the other attractions and activities during the day there was plenty of interest and excitement for a broad demographic. Our booth’s placement just inside the the Dutch barn, with folk music nearby, local food venders. cooling breezes off the river we had plenty of curious, knowledgeable visitors and much interest in canals and the recreation venues around our area. Thanks also to Nancy Papish for these photographs and to her and Maryanne Mackey for help with the booth and visiting with “our public.”



Construction continues on the Towpath Trail. Clearing a grubbing of the entire length (shown above in red) will be completed shortly. The contractor is trying to move a barge into Weger’s Pond outlet on which a pile driver can be mounted. The piles are necessary as a foundation for the 140 foot bridge across the outlet. The bridge will arrive in 20 foot sections. The fabricated bridge will be lifted in place by two “small” cranes at either end of the trail.